Integrated coal gasification combined cycle(IGCC)

 | English

Integrated Coal Gasification Combined Cycle (IGCC)

Integrated coal gasification combined cycle(IGCC)

Clean Coal Power R&D Co., Ltd. conducted IGCC demonstration test from 2007 to the end of fiscal 2012.Joban Joint Power Co., Ltd.. took over the demonstration plant as Nakoso power station unit No. 10 for commercial operation from fiscal 2013.
Air blown type IGCC system is adopted for unit No. 10.

In 2013, commercial operation of unit No.10 had started from June 28th and it stopped December 8th.
The operation time was 3,917 hours. It broke the world record for continuous operation time(3,287 hours) of IGCC which was set by Bugghenum power station in Netherland.

Unit No.10 has been discontinued.

Schematic of IGCC

An IGCC system is designed to achieve higher efficiency than conventional coal-fired power generation systems through the gasification of coal coupled with a combined cycle (CC) process.

Specifications of No.10 unit

Capacity 250 MW gross
Coal Consumption approx. 1,700 metric t/day
System Gasifier Air-blown & Dry Feed
Gas Treatment Wet (MDEA) + Gypsum Recovery
Gas Turbine 1200 deg C-class (50Hz)
Efficiency
(Target Values)
Gross 48% (LHV) 46% (HHV)
Net 42% (LHV) 40.5% (HHV)